At first, the Jai Hind metro station was prepared being elevated. Even so, the AAI objected that the elevated stretch up towards the airport may well pose a risk to aircraft, And so the route was additional reworked as well as station was shifted underground, 150 m through the Airport https://thomasn624gdx0.slypage.com/profile