Resulting from production challenges, shipping and delivery delays occurred for many J 35D subsystems, resulting in that the two Preliminary J 35D collection getting delivered with only aspects of the planned avionics put in. In advance of it absolutely was made a decision to establish the JAS 39 Gripen during https://kra35-cc43197.ampblogs.com/examine-this-report-on-kra35-73156916