Installation Overview Newsome has efficiently delivered the installation and commissioning of a modern 400 kW chiller at a major confectionery manufacturing site in York. This initiative reflects a notable step forward in the client’s Environmental, Social and Governance framework, enhancing operational resilience and delivering measurable decreases in both energy consumption https://social4geek.com/story6362388/high-efficiency-400-kw-chiller-installation-achieves-50-000-yearly-energy-savings-and-200-metric-tonnes-co%E2%82%82-reduction